Background: I'm working on creating a configuration template to be able to use Urban Turtle with MS CMMI. I like the new Blocked indicator a lot, but I can't enable that in the CMMI template, because the indicator decides on the blocked status based on whether the chosen TFS field is filled (in the Scrum template it's "yes" or empty). In case of CMMI, it's always filled - values are "yes" or "no" - so it's always filled, and Urban Turtle always shows an item as blocked.
Idea: make Urban Turtle determine the Blocked status based on (preferably customizable) field value, not on whether or not the field is filled.
-
You are right, we do only check whether or not the field is empty to determine if the work item is blocked. This is something we hope to change for the next release (3.11). Thank you for reporting this. I have added your suggestion to our backlog.
-
-
When configuring the "blocked task" feature, can you click on the card to change the blocked status? It appears you can only open the work item to change the status. Also, what values does it use? Yes/No? Blank/Non-blank? On mine, it always showed the blocked icon whether it was "Yes" or "No" (non-blank).
This reply was created from a merged topic originally titled
Blocked item questions. -
-
Urban Turtle 3.11 is now available. Check it out!
-
Loading Profile...



Twitter,
Facebook, or email.

